2-29-12: Spec Miata Progress

Posted: February 29, 2012 in Racing

I recently ordered the Miatacage and got it in earlier this week.  Talk about one heavy box (~ 100 lbs) and about 5’x5’x1′ box.  I won’t be able to get this welded in until the latter part of March but wanted to check to see everything was in there.  The kit comes with many neat features including kill switch plate, laser cut perches and detailed installation instructions.  After organizing and reading through the instructions I have a lot more prep work that I thought I needed to do that I can do at home myself (this includes stripping off paint, seam filler and undercoating where we will be welding to the frame / floor of the car).

This slideshow requires JavaScript.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s