2-17-12: Spec Miata Progress

Posted: February 17, 2012 in Racing

Work has been very crazy the past 3 weeks so I’ve been having trouble getting free time to work on the car (plus with it at RennsportKC I wasn’t able to get much done).  So this past week the rebuilt engine / tranny was reinstalled and the car was started up and running – warmed up and ready to go.  I also started ordering some of the safety equipment including the cage from Miatacage.  Also to be installed is the East Street Imports tunnel notch panel that will help give more horizontal room to center the seat behind the steering wheel.

This slideshow requires JavaScript.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s