2.2.12: Spec Miata Progress

Posted: February 2, 2012 in Racing

It’s been a little while since I last posted progress.  Things are moving along albeit a little slowly.  I’ve been very busy at work so my evenings and weekends have been affected.  However Karl & Wes have finished rebuilding and installing the motor in the Spec Miata.  I also had some time to run out and pick up the header to put some exhaust wrap on it to hopefully help keep down engine bay temperature and reduce the floor heat as exhaust header is on drivers side.  We should have motor up and running this weekend and the car driveable.  Once we get it to that state then…it’s time for putting in a cage and safety equipment, then lastly going over suspension / alignment.

This slideshow requires JavaScript.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s